constructionCost
P3154
predicate
Indicates the monetary or resource expenditure required to build or construct something.
All labels observed (10)
| Label | Occurrences |
|---|---|
| constructionCost canonical | 306 |
| hasConstructionCost | 7 |
| constructionCostUSD | 4 |
| builtCost | 3 |
| approximateCost | 1 |
| buildingCost | 1 |
| constructionCostOfRenovation | 1 |
| constructionCost_USD | 1 |
| coolingTowersCost | 1 |
| costOfConstruction | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: constructionCost
Generated description
Indicates the monetary or resource expenditure required to build or construct something.
Sample triples (326)
| Subject | Object |
|---|---|
| LGV Bretagne-Pays de la Loire | several billion euros ⓘ |
| Nagyerdei Stadium | approximately 12.5 billion HUF ⓘ |
| National Centre for Infectious Diseases | approximately S$800 million ⓘ |
| Coolray Field | $64 million ⓘ |
| J. Percy Priest Dam | approximately 50 million US dollars ⓘ |
|
The Walter Pyramid
surface form:
Walter Pyramid
|
approximately 22 million US dollars ⓘ |
| Elan Aqueduct | approximately £6 million (early 20th century) ⓘ |
| The Mirage (Las Vegas) | 630000000 USD ⓘ |
| Sky Stadium | 130000000 NZD ⓘ |
| H-3 | over 1 billion US dollars ⓘ |
| Ertan Dam | about US$2 billion ⓘ |
|
Enterprise Center arena
surface form:
Enterprise Center
|
approximately 135 million US dollars ⓘ |
| Grand Stade de Lyon | about €400 million ⓘ |
|
AAA
surface form:
American Airlines Arena
|
approximately 213000000 USD ⓘ |
|
Triple A
surface form:
American Airlines Arena
|
213000000 USD ⓘ |
| Stoosbahn funicular | approximately 52 million CHF ⓘ |
| 3Arena | €80 million ⓘ |
|
Stadion Narodowy (National Stadium)
surface form:
Stadion Narodowy
|
about 2 billion PLN ⓘ |
| PNC Stadium | 60000000 USD ⓘ |
| Estadi Cornellà-El Prat | €60 million ⓘ |
| John Redmond Dam | approximately 20 million US dollars ⓘ |
| West Hall | $980 million ⓘ |
| Bataan Nuclear Power Plant | approximately 2.3 billion US dollars ⓘ |
| Canvas Stadium | $220 million ⓘ |
| Royal Arena | approximately 650 million DKK ⓘ |
| Second Penang Bridge | about RM4.5 billion ⓘ |