majorRevisionPeriod
P147300
predicate
Indicates the time span during which substantial or significant changes are made to something, such as a document, plan, or project.
Observed surface forms (2)
- earliestMajorReviewAffecting ×1
- hasMajorAlterationPeriod ×1
Sample triples (3)
| Subject | Object |
|---|---|
| Symphony No. 9 in D minor | 1890s ⓘ |
| Château de Gizeux | 16th century via predicate surface "hasMajorAlterationPeriod" ⓘ |
| Greater Manchester parliamentary constituencies | Third Periodic Review of Westminster constituencies via predicate surface "earliestMajorReviewAffecting" NERFINISHED ⓘ |