totalTimeOccupiedByCrew
P145205
predicate
Indicates the total duration of time that a crew occupies or is assigned to a particular task, resource, or location.
Observed surface forms (1)
- totalCrewedOccupationTime ×1
Sample triples (2)
| Subject | Object |
|---|---|
| Orbital Workshop | about 171 days ⓘ |
| Skylab Orbital Workshop | approximately 171 days via predicate surface "totalCrewedOccupationTime" ⓘ |