Teesta hydropower cascade
E921572
Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Teesta hydropower cascade canonical | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T11364838 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Teesta hydropower cascade Context triple: [Teesta Low Dam IV, isPartOfCascade, Teesta hydropower cascade]
-
A.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
B.
Kishanganga Hydroelectric Plant
The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
-
C.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
D.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
E.
Dasu Hydropower Project area
The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Teesta hydropower cascade Target entity description: Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
-
A.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
B.
Kishanganga Hydroelectric Plant
The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
-
C.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
D.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
E.
Dasu Hydropower Project area
The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
- F. None of above. chosen
Statements (37)
| Predicate | Object |
|---|---|
| instanceOf |
hydroelectric project cascade
ⓘ
infrastructure project ⓘ |
| countryBeneficiary | India NERFINISHED ⓘ |
| developedFor | large-scale power generation ⓘ |
| energySource | hydropower ⓘ |
| hasComponent |
Teesta Low Dam projects
ⓘ
Teesta Stage I Hydroelectric Project NERFINISHED ⓘ Teesta Stage II Hydroelectric Project NERFINISHED ⓘ Teesta Stage III Hydroelectric Project NERFINISHED ⓘ Teesta Stage IV Hydroelectric Project NERFINISHED ⓘ Teesta Stage V Hydroelectric Project NERFINISHED ⓘ |
| hasImpactOn |
aquatic ecosystems
ⓘ
regional power supply ⓘ river hydrology ⓘ |
| isSubjectOf |
environmental impact assessments
ⓘ
hydropower planning studies ⓘ water resources management policies ⓘ |
| locatedInCountry | India ⓘ |
| locatedInMountainRange | Himalayas NERFINISHED ⓘ |
| locatedInRegion |
Sikkim
NERFINISHED
ⓘ
West Bengal NERFINISHED ⓘ |
| locatedOnRiver | Teesta River NERFINISHED ⓘ |
| mainRiver | Teesta River NERFINISHED ⓘ |
| partOf | Teesta River hydropower development ⓘ |
| planningBasis | cascade development of Teesta River ⓘ |
| purpose |
electricity generation
ⓘ
hydropower development ⓘ |
| riverBasin | Teesta basin NERFINISHED ⓘ |
| sector | power sector ⓘ |
| technologyType |
run-of-the-river hydropower
ⓘ
storage hydropower ⓘ |
| typeOfGeneration | grid-connected power generation ⓘ |
| usesInfrastructure |
dams
ⓘ
powerhouses ⓘ transmission lines ⓘ tunnels ⓘ |
| usesResource | river flow ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Teesta hydropower cascade Description of subject: Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.