The British electricity transmission network is the high-voltage grid that transports electricity across Great Britain from large generators, such as nuclear power stations, to regional distribution networks and major consumers.
All labels observed (2)
| Label | Occurrences |
|---|---|
| British electricity transmission network canonical | 1 |
| national grid | 1 |
Statements (49)
| Predicate | Object |
|---|---|
| instanceOf |
electricity transmission system
ⓘ
high-voltage power grid ⓘ |
| connectsTo |
Belgium–UK electricity interconnectors
NERFINISHED
ⓘ
France–UK electricity interconnectors NERFINISHED ⓘ Ireland–Great Britain electricity interconnectors NERFINISHED ⓘ Netherlands–UK electricity interconnectors NERFINISHED ⓘ Norway–UK electricity interconnectors NERFINISHED ⓘ large electricity generators in Great Britain ⓘ major industrial consumers ⓘ regional electricity distribution networks in Great Britain ⓘ |
| country | United Kingdom ⓘ |
| coversTerritory |
England
NERFINISHED
ⓘ
Scotland NERFINISHED ⓘ Wales NERFINISHED ⓘ |
| doesNotCoverTerritory | Northern Ireland NERFINISHED ⓘ |
| energyCarrier | alternating current ⓘ |
| frequency | 50 Hz ⓘ |
| hasComponent |
interconnectors
ⓘ
overhead transmission lines ⓘ substations ⓘ transformers ⓘ underground cables ⓘ |
| hasPlanningAuthority | UK government for nationally significant infrastructure projects ⓘ |
| operatedBy |
National Grid Electricity System Operator
NERFINISHED
ⓘ
National Grid Electricity Transmission NERFINISHED ⓘ Scottish Hydro Electric Transmission NERFINISHED ⓘ Scottish Power Transmission NERFINISHED ⓘ |
| ownedBy | transmission owners licensed by Ofgem ⓘ |
| partOf | British electricity system ⓘ |
| purpose |
balancing electricity supply and demand across Great Britain
ⓘ
bulk transport of electrical energy ⓘ |
| regulatedActivity | electricity transmission ⓘ |
| regulator | Ofgem NERFINISHED ⓘ |
| serves | Great Britain NERFINISHED ⓘ |
| subjectTo |
UK electricity market rules
ⓘ
UK grid code NERFINISHED ⓘ |
| supports |
integration of renewable energy sources
ⓘ
security of electricity supply in Great Britain ⓘ |
| synchronizationArea | synchronous area of Great Britain NERFINISHED ⓘ |
| transportsElectricityFrom |
coal-fired power stations
ⓘ
gas-fired power stations ⓘ hydroelectric power stations ⓘ nuclear power stations ⓘ offshore wind farms ⓘ onshore wind farms ⓘ solar power plants ⓘ |
| voltageLevel |
132 kV
ⓘ
275 kV ⓘ 400 kV ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
Instruction
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Input
Subject: British electricity transmission network Description of subject: The British electricity transmission network is the high-voltage grid that transports electricity across Great Britain from large generators, such as nuclear power stations, to regional distribution networks and major consumers.
Referenced by (2)
Full triples — surface form annotated when it differs from this entity's canonical label.
this entity surface form:
national grid