Peligre hydroelectric plant
E632826
The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Peligre hydroelectric plant canonical | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T6982439 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Peligre hydroelectric plant Context triple: [Artibonite River, hydroelectricPlant, Peligre hydroelectric plant]
-
A.
Maria Cristina Hydroelectric Plant
The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
-
B.
Flix hydroelectric plant
The Flix hydroelectric plant is a hydroelectric power station located in the municipality of Flix in Catalonia, Spain, generating electricity from the flow of the Ebro River.
-
C.
Machicura hydropower plant
The Machicura hydropower plant is a hydroelectric facility in Chile that forms part of the larger Maule hydropower complex, contributing renewable energy generation to the regional power grid.
-
D.
Alfalfal hydroelectric plant
The Alfalfal hydroelectric plant is a power-generating facility in Chile that harnesses the flow of the Maipo River to produce electricity.
-
E.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Peligre hydroelectric plant Target entity description: The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
-
A.
Maria Cristina Hydroelectric Plant
The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
-
B.
Flix hydroelectric plant
The Flix hydroelectric plant is a hydroelectric power station located in the municipality of Flix in Catalonia, Spain, generating electricity from the flow of the Ebro River.
-
C.
Machicura hydropower plant
The Machicura hydropower plant is a hydroelectric facility in Chile that forms part of the larger Maule hydropower complex, contributing renewable energy generation to the regional power grid.
-
D.
Alfalfal hydroelectric plant
The Alfalfal hydroelectric plant is a power-generating facility in Chile that harnesses the flow of the Maipo River to produce electricity.
-
E.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
- F. None of above. chosen
Statements (46)
| Predicate | Object |
|---|---|
| instanceOf |
dam
ⓘ
hydroelectric power plant ⓘ |
| affects | Artibonite River valley NERFINISHED ⓘ |
| alsoKnownAs |
Centrale hydroélectrique de Péligre
NERFINISHED
ⓘ
Péligre Dam power station NERFINISHED ⓘ |
| basinCountry | Haiti NERFINISHED ⓘ |
| commissioned | mid-20th century ⓘ |
| constructionStart | 1950s ⓘ |
| continent |
Caribbean
NERFINISHED
ⓘ
North America ⓘ |
| country | Haiti ⓘ |
| creates | Peligre Reservoir NERFINISHED ⓘ |
| designedFor | electricity supply to Haiti ⓘ |
| energySource | hydropower ⓘ |
| gridConnection | Haitian national grid ⓘ |
| hasImpact |
changes in sedimentation patterns
ⓘ
displacement of local communities ⓘ flood control on Artibonite River ⓘ irrigation potential downstream ⓘ |
| hasPart |
Peligre Dam
NERFINISHED
ⓘ
hydroelectric power station ⓘ |
| inception | 1950s ⓘ |
| languageOfCountry |
French
ⓘ
Haitian Creole ⓘ |
| locatedEastOf | Port-au-Prince NERFINISHED ⓘ |
| locatedIn | Artibonite Department NERFINISHED ⓘ |
| locatedNear | Péligre NERFINISHED ⓘ |
| locatedOnRiver | Artibonite River NERFINISHED ⓘ |
| ownerCountry | Haiti NERFINISHED ⓘ |
| partOf | Haiti power infrastructure ⓘ |
| primaryFunction | electricity generation ⓘ |
| providesElectricityTo |
Port-au-Prince metropolitan area
NERFINISHED
ⓘ
central Haiti ⓘ |
| purpose |
power generation
ⓘ
water management ⓘ |
| region | Central Plateau of Haiti NERFINISHED ⓘ |
| reservoirName | Peligre Reservoir NERFINISHED ⓘ |
| significance |
largest hydroelectric facility in Haiti
ⓘ
major source of electricity for Haiti ⓘ |
| status | operational ⓘ |
| strategicImportance | critical for Haiti’s electricity supply ⓘ |
| typeOfDam | concrete dam ⓘ |
| uses | flow of the Artibonite River ⓘ |
| vulnerability |
susceptible to drought-related output reductions
ⓘ
susceptible to sedimentation in reservoir ⓘ |
| watercourseDam | Artibonite River NERFINISHED ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Peligre hydroelectric plant Description of subject: The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.