STS-104
E524374
STS-104 was a 2001 Space Shuttle mission that delivered and installed the Quest Joint Airlock to the International Space Station, enhancing the station’s spacewalk capabilities.
Statements (47)
| Predicate | Object |
|---|---|
| instanceOf |
NASA spaceflight
ⓘ
Space Shuttle mission ⓘ |
| airlockAlternateName | Joint Airlock NERFINISHED ⓘ |
| airlockName | Quest Joint Airlock NERFINISHED ⓘ |
| apsis | low Earth orbit ⓘ |
| callsign | Atlantis NERFINISHED ⓘ |
| commander | Steven W. Lindsey NERFINISHED ⓘ |
| country |
United States of America
ⓘ
surface form:
United States
|
| crewSize | 5 ⓘ |
| dockedTo |
ISS Destiny laboratory
NERFINISHED
ⓘ
ISS Unity node NERFINISHED ⓘ |
| evaCount | 3 ⓘ |
| evaPurpose |
Attach and configure high-pressure gas tanks
ⓘ
Install and outfit Quest Joint Airlock ⓘ |
| inclination | 51.6 degrees ⓘ |
| issAssemblyFlight | 7A ⓘ |
| issExpeditionSupported | Expedition 2 NERFINISHED ⓘ |
| issModuleDelivered |
High-Pressure Gas Tanks
ⓘ
Quest Joint Airlock NERFINISHED ⓘ |
| landingDate | 2001-07-24 ⓘ |
| landingMass | 90,000 kilograms ⓘ |
| landingSite | Kennedy Space Center Shuttle Landing Facility NERFINISHED ⓘ |
| launchDate | 2001-07-12 ⓘ |
| launchMass | 116,000 kilograms ⓘ |
| launchSite | Kennedy Space Center Launch Complex 39B NERFINISHED ⓘ |
| missionDuration | 12 days 18 hours 36 minutes ⓘ |
| missionNumber |
Atlantis flight 24
NERFINISHED
ⓘ
Space Shuttle mission 105 NERFINISHED ⓘ |
| missionPatchDepicts | Atlantis docked to the International Space Station NERFINISHED ⓘ |
| missionSpecialist |
James F. Reilly
NERFINISHED
ⓘ
Janet L. Kavandi NERFINISHED ⓘ Michael L. Gernhardt NERFINISHED ⓘ |
| missionType | International Space Station assembly mission ⓘ |
| notableFeature |
Delivered the first dedicated airlock for the ISS
ⓘ
Enabled ISS-based U.S. and joint spacewalks without relying on Shuttle airlock ⓘ |
| operator | NASA ⓘ |
| orbitApogee | 396 kilometers ⓘ |
| orbitPerigee | 384 kilometers ⓘ |
| orbitsCompleted | 200 ⓘ |
| pilot | Charles O. Hobaugh NERFINISHED ⓘ |
| primaryObjective |
Deliver and install the Quest Joint Airlock to the International Space Station
ⓘ
Enhance ISS spacewalk capabilities ⓘ |
| programGoal | Assembly and maintenance of the International Space Station ⓘ |
| spacecraft | Space Shuttle Atlantis NERFINISHED ⓘ |
| spaceShuttleProgram | Space Shuttle program NERFINISHED ⓘ |
| visitedDestination | International Space Station NERFINISHED ⓘ |
| year | 2001 ⓘ |
Referenced by (4)
Full triples — surface form annotated when it differs from this entity's canonical label.