STS-104
E524374
STS-104 was a 2001 Space Shuttle mission that delivered and installed the Quest Joint Airlock to the International Space Station, enhancing the station’s spacewalk capabilities.
All labels observed (1)
| Label | Occurrences |
|---|---|
| STS-104 canonical | 4 |
How this entity was disambiguated
This entity first appeared as the object of triple T5050274 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: STS-104 Context triple: [Space Shuttle Atlantis, mission, STS-104]
-
A.
STS-94
STS-94 was a 1997 NASA Space Shuttle Columbia mission focused on microgravity and materials science research as a reflight of the earlier STS-83 mission.
-
B.
STS-101
STS-101 was a 2000 Space Shuttle Atlantis mission to the International Space Station focused on resupply, maintenance, and assembly tasks.
-
C.
STS-103
STS-103 was a NASA Space Shuttle Discovery mission in 1999 dedicated to repairing and upgrading the Hubble Space Telescope to extend its operational life and scientific capabilities.
-
D.
STS-97
STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
-
E.
STS-100
STS-100 was a 2001 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Canadarm2 robotic arm as a key component of the station’s assembly and operations.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: STS-104 Target entity description: STS-104 was a 2001 Space Shuttle mission that delivered and installed the Quest Joint Airlock to the International Space Station, enhancing the station’s spacewalk capabilities.
-
A.
STS-94
STS-94 was a 1997 NASA Space Shuttle Columbia mission focused on microgravity and materials science research as a reflight of the earlier STS-83 mission.
-
B.
STS-101
STS-101 was a 2000 Space Shuttle Atlantis mission to the International Space Station focused on resupply, maintenance, and assembly tasks.
-
C.
STS-103
STS-103 was a NASA Space Shuttle Discovery mission in 1999 dedicated to repairing and upgrading the Hubble Space Telescope to extend its operational life and scientific capabilities.
-
D.
STS-97
STS-97 was a Space Shuttle Endeavour mission in 2000 that delivered and installed the first set of U.S.-built solar arrays to the International Space Station, significantly increasing the station’s power capacity.
-
E.
STS-100
STS-100 was a 2001 Space Shuttle Endeavour mission to the International Space Station that delivered and installed the Canadarm2 robotic arm as a key component of the station’s assembly and operations.
- F. None of above. chosen
Statements (47)
| Predicate | Object |
|---|---|
| instanceOf |
NASA spaceflight
ⓘ
Space Shuttle mission ⓘ |
| airlockAlternateName | Joint Airlock NERFINISHED ⓘ |
| airlockName | Quest Joint Airlock NERFINISHED ⓘ |
| apsis | low Earth orbit ⓘ |
| callsign | Atlantis NERFINISHED ⓘ |
| commander | Steven W. Lindsey NERFINISHED ⓘ |
| country |
United States of America
ⓘ
surface form:
United States
|
| crewSize | 5 ⓘ |
| dockedTo |
ISS Destiny laboratory
NERFINISHED
ⓘ
ISS Unity node NERFINISHED ⓘ |
| evaCount | 3 ⓘ |
| evaPurpose |
Attach and configure high-pressure gas tanks
ⓘ
Install and outfit Quest Joint Airlock ⓘ |
| inclination | 51.6 degrees ⓘ |
| issAssemblyFlight | 7A ⓘ |
| issExpeditionSupported | Expedition 2 NERFINISHED ⓘ |
| issModuleDelivered |
High-Pressure Gas Tanks
ⓘ
Quest Joint Airlock NERFINISHED ⓘ |
| landingDate | 2001-07-24 ⓘ |
| landingMass | 90,000 kilograms ⓘ |
| landingSite | Kennedy Space Center Shuttle Landing Facility NERFINISHED ⓘ |
| launchDate | 2001-07-12 ⓘ |
| launchMass | 116,000 kilograms ⓘ |
| launchSite | Kennedy Space Center Launch Complex 39B NERFINISHED ⓘ |
| missionDuration | 12 days 18 hours 36 minutes ⓘ |
| missionNumber |
Atlantis flight 24
NERFINISHED
ⓘ
Space Shuttle mission 105 NERFINISHED ⓘ |
| missionPatchDepicts | Atlantis docked to the International Space Station NERFINISHED ⓘ |
| missionSpecialist |
James F. Reilly
NERFINISHED
ⓘ
Janet L. Kavandi NERFINISHED ⓘ Michael L. Gernhardt NERFINISHED ⓘ |
| missionType | International Space Station assembly mission ⓘ |
| notableFeature |
Delivered the first dedicated airlock for the ISS
ⓘ
Enabled ISS-based U.S. and joint spacewalks without relying on Shuttle airlock ⓘ |
| operator | NASA ⓘ |
| orbitApogee | 396 kilometers ⓘ |
| orbitPerigee | 384 kilometers ⓘ |
| orbitsCompleted | 200 ⓘ |
| pilot | Charles O. Hobaugh NERFINISHED ⓘ |
| primaryObjective |
Deliver and install the Quest Joint Airlock to the International Space Station
ⓘ
Enhance ISS spacewalk capabilities ⓘ |
| programGoal | Assembly and maintenance of the International Space Station ⓘ |
| spacecraft | Space Shuttle Atlantis NERFINISHED ⓘ |
| spaceShuttleProgram | Space Shuttle program NERFINISHED ⓘ |
| visitedDestination | International Space Station NERFINISHED ⓘ |
| year | 2001 ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: STS-104 Description of subject: STS-104 was a 2001 Space Shuttle mission that delivered and installed the Quest Joint Airlock to the International Space Station, enhancing the station’s spacewalk capabilities.
Referenced by (4)
Full triples — surface form annotated when it differs from this entity's canonical label.