STS-112
E474249
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
All labels observed (1)
| Label | Occurrences |
|---|---|
| STS-112 canonical | 5 |
How this entity was disambiguated
This entity first appeared as the object of triple T4840179 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: STS-112 Context triple: [Piers Sellers, spaceMission, STS-112]
-
A.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
B.
STS-122
STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
-
C.
STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
D.
STS-121
STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
-
E.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: STS-112 Target entity description: STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
-
A.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
B.
STS-122
STS-122 was a 2008 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the European Space Agency’s Columbus laboratory module.
-
C.
STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
D.
STS-121
STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
-
E.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
- F. None of above. chosen
Statements (45)
| Predicate | Object |
|---|---|
| instanceOf |
NASA spaceflight
ⓘ
Space Shuttle mission ⓘ |
| carriedComponentFor | International Space Station truss structure ⓘ |
| commander | Jeffrey S. Ashby NERFINISHED ⓘ |
| cosmonautOnboard | Fyodor Yurchikhin NERFINISHED ⓘ |
| countryOfOrigin |
United States of America
ⓘ
surface form:
United States
|
| crewSize | 6 ⓘ |
| destination | International Space Station NERFINISHED ⓘ |
| evaPerformed | yes ⓘ |
| issAssemblyFlight | 9A ⓘ |
| issModuleInstalled | S1 truss ⓘ |
| landingDate | 2002-10-18 ⓘ |
| landingMass | 90,084 kg ⓘ |
| landingSite | Kennedy Space Center Shuttle Landing Facility NERFINISHED ⓘ |
| launchDate | 2002-10-07 ⓘ |
| launchMass | 116,459 kg ⓘ |
| launchSite | Kennedy Space Center Launch Complex 39B NERFINISHED ⓘ |
| missionDuration |
10 days
ⓘ
11 hours ⓘ 19 minutes ⓘ |
| missionNumber | 112 ⓘ |
| missionSpecialist |
David A. Wolf
NERFINISHED
ⓘ
Fyodor Yurchikhin NERFINISHED ⓘ Piers J. Sellers NERFINISHED ⓘ Sandra H. Magnus NERFINISHED ⓘ |
| nextMission | STS-113 NERFINISHED ⓘ |
| notableEvent | First use of the Shuttle’s umbilical camera for external tank separation imagery ⓘ |
| numberOfEVAs | 3 ⓘ |
| orbitApogee | 396 km ⓘ |
| orbiterVehicle | Atlantis NERFINISHED ⓘ |
| orbitInclination | 51.6 degrees ⓘ |
| orbitingBody | Earth NERFINISHED ⓘ |
| orbitPerigee | 383 km ⓘ |
| orbitPeriod | 92 minutes ⓘ |
| partOf | ISS assembly sequence ⓘ |
| payload | Integrated Truss Structure S1 NERFINISHED ⓘ |
| pilot | Pamela A. Melroy NERFINISHED ⓘ |
| previousMission | STS-111 NERFINISHED ⓘ |
| primaryObjective | Delivery and installation of the S1 truss segment ⓘ |
| program | Space Shuttle program NERFINISHED ⓘ |
| spaceAgency | NASA ⓘ |
| spacecraft | Space Shuttle Atlantis NERFINISHED ⓘ |
| totalEVATime |
19 hours
ⓘ
41 minutes ⓘ |
| yearOfMission | 2002 ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: STS-112 Description of subject: STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
Referenced by (5)
Full triples — surface form annotated when it differs from this entity's canonical label.